Chili Pepper - Table 1

Chili Pepper Production Practices and Sample Costs

Table 1. COSTS PER ACRE TO PRODUCE CHILI PEPPER
Coachella Valley - 1995/1996

  • Labor Rate:
    • $6.70/hr. machine labor
    • $6.70/hr. non-machine labor
  • Interest Rate: 11.61%
  • Yield per Acre: 1200 Boxes
COSTS PER ACRE TO PRODUCE CHILI PEPPER
 Cash and Labor Costs per Acre 
OperationOperationTime (Hrs/A)Labor CostFuel, Lube & RepairsMaterial CostCustom/RentTotal CostYour Cost
Preplant:
Chop Prior Crop Residue0.3332004 
Disc0.4444007 
Plow0.80650012 
Disc 2X1.4011120023 
Leveling - Land Plane0.90760014 
Custom Manure Application0.000007575 
List0.5044008 
Pre-Irrigation1.3820035055 
Roll cultivate beds0.3022005 
Shape Beds - mulch & t-tape1.2026102900326 
Plumb layflat & irrigate1.3820035035 
Punch holes in mulch1.00840012 
TOTAL PREPLANT COSTS9.621124836075596 
 
Cultural:
Transplant peppers13.208804360524 
Fertigation - Drip5.52370820119 
Clip Weed seedlings4.402900029 
Cultivate Beds0.5043007 
Irrigation - Drip5.5237040077 
TOTAL CULTURAL COSTS29.1419635580757 
 
Harvest:
Hand Pick & Pack Peppers0.5043372003727 
Ship to LA Market0.20210600602 
LA Broker Commision0.0000015601560 
TOTAL HARVEST COSTS0.7063372021605889 
 
Interest on operating capital @ 11.61% 85 
TOTAL OPERATING COSTS/ACRE 31355463822357326 
TOTAL OPERATING COSTS/BOX     6.11 
 
CASH OVERHEAD:
Land Rent 133 
Office Expense 30 
Liability Insurance 25 
Sanitation 0 
Property Taxes 11 
Property Insurance 8 
Investment Repairs 54 
TOTAL CASH OVERHEAD COSTS 261 
 
TOTAL CASH COSTS/ACRE 7588 
TOTAL CASH COSTS/BOX 6.32 
 
  Annual Cost    
NON-CASH OVERHEAD:Per Producing AcreDepreciationInterest @ 3.72%    
Investment:
Shop Building13363  9 
Shop Tools4421  3 
Fuel Tanks & Pumps1810  1 
Irrigation System10003020  80 
Equipment8116417  80 
TOTAL NON-CASH OVERHEAD COSTS200613341  174 
 
TOTAL COSTS/ACRE     7761 
TOTAL COSTS/BOX     6.47 

Back to "Chili Pepper Production Practices and Sample Costs" Page