UC ANR Small Farms Network

Okra - Table 5

Table 5. HOURLY EQUIPMENT COSTS TO PRODUCE OKRA
Coachella Valley-1995/1996

HOURLY EQUIPMENT COSTS TO PRODUCE OKRA

 COSTS PER HOUR 
 Non-Cash OverheadCash OverheadOperating 
 Actual Hours UsedDepreciationInterestInsuranceTaxesRepairsFuel & LubeTotal Oper.Total Costs/Hour
95 60 HP 2WD Tractor192.56.491.770.340.481.672.914.5813.65
95 90 HP 2WD Tractor1306.91.210.330.060.092.104.376.478.16
95 Bed Shaper - 3 row60.02.700.740.140.200.970.000.974.74
95 Cult - 2 Row 40"120.01.280.430.080.121.220.001.223.13
95 Disc - 8' Offset456.00.480.160.030.041.750.001.752.47
95 Lister - 3 Row 40"72.00.800.270.050.070.460.000.461.66
95 Mower - Flail 6'156.01.180.270.050.071.230.001.232.81
95 Planter - 2 row 40"192.00.890.200.040.051.580.001.582.76
95 Plow - 3 Bottom144.01.400.480.090.131.610.001.613.71
95 Shank Injector60.01.350.370.070.101.090.001.092.97
95 Sprayer - 200 gal168.00.790.250.050.071.510.001.512.67
95 Toolbar - 4 Row 40"168.00.270.090.020.020.350.000.350.75
95 Triplane - 12'108.04.531.550.300.421.970.001.978.77

 

Back to Okra

Okra - Table 1   Okra - Table 2   Okra - Table 3   Okra - Table 4   Okra - Table 6