Okra - Table 5

Table 5. HOURLY EQUIPMENT COSTS TO PRODUCE OKRA
Coachella Valley-1995/1996

HOURLY EQUIPMENT COSTS TO PRODUCE OKRA

  COSTS PER HOUR  
  Non-Cash Overhead Cash Overhead Operating  
  Actual Hours Used Depreciation Interest Insurance Taxes Repairs Fuel & Lube Total Oper. Total Costs/Hour
95 60 HP 2WD Tractor 192.5 6.49 1.77 0.34 0.48 1.67 2.91 4.58 13.65
95 90 HP 2WD Tractor 1306.9 1.21 0.33 0.06 0.09 2.10 4.37 6.47 8.16
95 Bed Shaper - 3 row 60.0 2.70 0.74 0.14 0.20 0.97 0.00 0.97 4.74
95 Cult - 2 Row 40" 120.0 1.28 0.43 0.08 0.12 1.22 0.00 1.22 3.13
95 Disc - 8' Offset 456.0 0.48 0.16 0.03 0.04 1.75 0.00 1.75 2.47
95 Lister - 3 Row 40" 72.0 0.80 0.27 0.05 0.07 0.46 0.00 0.46 1.66
95 Mower - Flail 6' 156.0 1.18 0.27 0.05 0.07 1.23 0.00 1.23 2.81
95 Planter - 2 row 40" 192.0 0.89 0.20 0.04 0.05 1.58 0.00 1.58 2.76
95 Plow - 3 Bottom 144.0 1.40 0.48 0.09 0.13 1.61 0.00 1.61 3.71
95 Shank Injector 60.0 1.35 0.37 0.07 0.10 1.09 0.00 1.09 2.97
95 Sprayer - 200 gal 168.0 0.79 0.25 0.05 0.07 1.51 0.00 1.51 2.67
95 Toolbar - 4 Row 40" 168.0 0.27 0.09 0.02 0.02 0.35 0.00 0.35 0.75
95 Triplane - 12' 108.0 4.53 1.55 0.30 0.42 1.97 0.00 1.97 8.77

 

Back to Okra

Okra - Table 1   Okra - Table 2   Okra - Table 3   Okra - Table 4   Okra - Table 6


Source URL: https://oc4h.ucanr.edu/statewide-program/uc-anr-small-farms-network/okra-table-5